top of page

These systems use a rapid and effective suspension and reconnection process:

 

  • Check and verify housing

  • Suspension Notice

  • Taking the Actual Meter Reading

  • Close the marker and Stopcock

  • Withdrawal of the Measurer

  • Installation of the device according to the type of suspension to be performed:

Normal break: which is done with rigid wrench to get a depth of up to 25 inches
 

Drastic break: Which is done with the flexible application wrench to reach up to 2 meters deep

 

  • Checking the Suspension

SUSPENSION PROCEDURE

Union of Associated

Services and Engineering

bottom of page